APAS R&D Project (2021 - 2022)

 

  Project Ref No. Project Title Project Coordinator Project Period Funds Approved
1
ITP/004/21AP
Development of thin Al-Si coating technology for automotive lightweighting steels to solve the critical problem of delayed fracture
Prof Mingxin HUANG 01/07/2021 - 30/6/2023 1,015,130
2
ITP/005/21AP
Development of a Novel Segmented, Modular, Direct-Drive, Fault-Tolerant Motor for Power-Assisted Wheelchair Application
Dr Shuangxia NIU 01/09/2021 - 31/08/2023 1,500,000
3
ITP/006/21AP
Feasibility Study on Graphene Applications for Automotive Cabin Heating
Mr Samson Suen / Mr YC Ko 01/05/2021 - 31/10/2022 1,995,472
4
ITP/003/21AP
Development of Integrated and High-Efficient SiC Dual-Mode Drive Control System for Electric Trucks
Mr Larry Yu 15/07/2021 - 14/07/2023 6,800,000
5
ITP/020/21AP
Development of Severe Plastic Deformation (SPD) and Sheet Stamping Technologies for Customerized Engineering High Entropy Alloy (HEA) Auto Parts Manufacturing
Mr Francis Lai 01/07/2021 - 30/04/2023 2,999,970
6
ITP/021/21AP
R&D of AI Enhanced In-Vehicle Life Presence Detection System Based on Millimeter Wave Radar Technology
Mr Sam Shan / Ms Crystal Yan 04/10/2021 - 31/03/2023 2,800,000
7
ITT/026/19AI
Trial: Intelligent eBus with Light Body Structure and High Efficient Traction Motor System
Dr Rick Mo 01/11/2021 - 31/10/2023 7,069,257.5
8
PRP/006/21AI
Development of An Integrated Intelligent System for High value-added Critical Automotive Components MultiStage Manufacturing
Samson / Chuck 01/20/2021 - 30/09/2023 9,652,830
9
PRP/007/21AI
R&D of 19-Seater Low-Entry Full Electric Light Bus with Modular Battery and Smart Driving System
Dr Rick Mo / Mr Wynn Lyu 01/12/2021 - 29/11/2023 11,990,105
10
ITP/002/21AP
Next Generation High Performance and Regenerative Brake-by-Wire System for Smart Electric Vehicles
Mr Sunny Yu 01/10/2021 - 30/09/2023 2,995,000
11
ITP/035/21AP
R&D of Advanced AI Imaging System for Adverse Atmospheric Conditions for Autonomous Driving
Mr Thorsten Chan 01/11/2021 - 28/04/2023 2,746,000
12
ITP/019/21AP
Development of Cooperative Autonomous Roadwork Vehicle Cluster Using 5G C-V2X Communication
Mr Herman Chow 01/01/2022 - 30/06/2023 6,995,745.1
13
ITP/033/21AP
Next Generation AI Robotic Indoor Positioning System by Fusion of 3D Magnetic Sensor and Depth Camera
Mr Thorsten Chan 07/02/2022 - 05/08/2023 2,760,318
14
ITP/034/21AP
Development of Multi-Point Forming Technology with Process Parameters Optimization Mechanism for Manufacturing of Automotive Complex 3D Forming Aluminum Sheet Parts
Mr Francis Lai 01/01/2022 - 31/12/2022 1,694,520
15
ITP/048/21AP
Development of Autonomous People Mover System
Mr Jonathan Tang / Mr Sam Wong / Mr Angus Lam / Mr SC Ho 31/03/2022 - 01/10/2023 3,204,286
16
ITP/046/21AP
Development of In-Motion-Charging Self-Resonant Wireless In-Wheel Motor for Next-Generation Electric Vehicles
Dr Shuangxia NIU 28/03/2022 - 27/09/2023 1,499,450
17
ITP/047/21AP
Development of fixed-route autonomous driving for light vehicles with smart steering and enhanced power regeneration - the ultimate solution for smart steering and smart energy management
Prof Eric CHENG 28/03/2022 - 27/03/2024 4,260,541
18
PRP/002/22AI
Development of Electric Motorcycle with Integrated and High-efficient Powertrain System
Dr Rick Mo/ Mr Larry Li 31/03/2022 - 30/01/2024 6,980,000
19
ITT/016/21AP
Trial: Smart EV Charging Station based on Dynamic Power Management System
Mr Michael Wu 31/03/2022 - 30/01/2024 1,932,000
20
ITT/010/21AP
Trial: Low-speed Autonomous Mobility for Delivery and Inspection
Ms Cadence Law 31/03/2022 - 25/09/2023 896,855